Cedar Siding Installation Tips

Let cedar siding flex and breathe.
Cedar siding installation tips. Type of recommended finish coat priming coat. Cedar is a material that needs to be allowed to flex once installed. How to install cedar bevel siding 1. Movement length wise is minimal.
Take care not to nail through the overlap of two pieces. Do not reduce the siding overlap recommendations given in the installation sections of this publication. Fasten a cedar starter strip. Cedar siding can swell or shrink as it gains or loses moisture to reach equilibrium with the moisture content of the surrounding air.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure. But to minimize gaps take the time to miter angle cut and treat the ends as you install and the results will last for years. Recommended priming procedures for cedar siding. Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.
Roof ground clearance. For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care. Hot dipped galvanized aluminum and stainless steel nails are all corrosion resistant and can be. Place nail just above the overlap.
Also placing spacers between the slats will help to ensure a straight piece of siding. Bevel siding should be face nailed to studs with 1 1 4 inch penetration into solid wood using one nail per piece spaced at a maximum of 24 inches on center. Like all siding materials western red cedar performs best when installed properly on a suitable. Wrap the house with a polyethylene or similar moisture barrier stapled to the wooden wall sheathing with a.
Selection of a lap siding pattern minimizes the affect of that movement. Siding stacked with vertically aligned stickers table 2. Door and window flashing. Western red cedar siding pre installation tips recommended fasteners.
Air or kiln dried siding that has been kept dry can be installed immediately. Ensuring that the moisture content of cedar siding is at equilibrium before it is installed will minimize movement later on. Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board. It is best that the siding slats be kept six to 12 inches off the ground so that the exposure to water is limited.
The purpose of flashing window and door headers is to intercept water behind the siding and direct it to the outside.