Cedar Shake Siding Installation Guide

Solid sheathing is used in areas with wind driven snow.
Cedar shake siding installation guide. L determine the lowest point on the wall you will be siding. To achieve this the exposures should be slightly less than one third the length of the shingle. Align one of the vertical edges at the edge of the trim or corner of the wall. Cedar siding should be securely nailed to framing members furring members or to blocking between framing members.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure a proper installation. For example 16 inch long shingles should be installed with about 5 inch exposures. L using the chalk line as a guide install the top edge of the. Like all siding materials western red cedar performs best when installed properly on a suitable frame.
Attach the shake with a. 1 for windows vinyl siding and metal accessories. L snap a level chalk line from this point across the wall and repeat the procedure around the entire house. Solid sheathing is recommended for shakes and may be required in seismic regions or under treated shakes and shingles.
Measure up 1 4 6 4mm less than the width of the starter strip to mark your chalk line. For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care. For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources. Installation guide download for more than 75 years ply gem residential solutions has led the industry with a portfolio that is unmatched.
Align the thick lower edge of a cedar shake at the lower edge of the siding or shear wall. Remodeler andrew grace gives background information on types of cedar shakes and the standards and installation details outlined by the cedar shake and shingle bureau before walking through the steps to replacing a cedar roof from laying courses of self adhered membrane felt and ventilation matrix to setting up the first row of starter shingles to fitting valleys and capping hips and ridges. Flashing is an important line of defense in controlling moisture in wall assemblies. Spaced sheathing is usually 1 x 4 or 1 x 6 softwood boards and shall not be less than 1 x 4 boards.
Shakes and shingles may be applied over spaced sheathing.